Client: GTE Corp
Project: E911 Development Project
Description: Was the senior member of the engineering team which developed GTE's first Enhanced 911 switching system.
Description: Was the senior member of the engineering team which developed GTE's first Enhanced 911 switching system.
Description: Determined the requirements and recommended an approach for upgrading the command and control radio system for Seabrook Nuclear Station and for public safety radios in the surrounding towns so the town`s radio`s would interoperate. Addressed several propagation and technical performance issues.